This estimate covers a full gut renovation of a bathroom in the Denver metro area. Pricing reflects current local labor rates and mid-range material selections. Actual costs will vary based on specific product choices, unforeseen conditions, and contractor overhead.

Estimated Investment
$16.7K33.3K

Includes 15% contingency

All estimates are for planning purposes only. Actual costs may vary based on location, materials, and contractor rates.

Project Parameters
Room Type
Bathroom
Region
Denver, Colorado, United States
Area
60 sq ft
Scope of Work
Full gut renovation

Renovation Roadmap

Demolition costs depend on the amount of existing material to remove and local disposal fees. Older homes may require hazardous material testing and abatement.

  • Remove existing fixtures (toilet, vanity, tub/shower)
  • Demolish wall and floor coverings (tile, drywall, flooring)
  • Haul away debris and dispose responsibly
  • Protect adjacent areas from dust and damage
Cost Breakdown
Demolition & Disposal
Labor$240–480
60 sqft × $4–8/sqft
Materials$0–0
60 sqft × $0–0/sqft
Stage Total$240–480
Common Pitfalls

Unexpected structural damage behind walls

Asbestos or lead paint in older homes

Disposal fees varying by material type

Plumbing costs vary with the number of fixtures, pipe material choice (copper vs. PEX), and any required upgrades to meet current code.

  • Install new supply lines to fixtures
  • Rough-in drain and vent lines
  • Pressure test all connections
  • Coordinate with inspector for approval
Cost Breakdown
Rough Plumbing
Labor$1,600–3,200
4 fixture × $400–800/fixture
Materials$800–1,600
4 fixture × $200–400/fixture
Stage Total$2,400–4,800
Common Pitfalls

Outdated piping requiring full replacement

Code-required venting changes

Access limitations in tight spaces

Electrical work is priced per circuit and depends on panel capacity, wiring method, and the number of devices. Bathrooms require dedicated GFCI circuits.

  • Run new circuits for lighting, outlets, and fan
  • Install GFCI-protected receptacles
  • Rough-in wiring for exhaust fan and heated floor (if applicable)
  • Schedule electrical inspection
Cost Breakdown
Rough Electrical
Labor$750–1,500
3 circuit × $250–500/circuit
Materials$600–1,200
3 circuit × $200–400/circuit
Stage Total$1,350–2,700
Common Pitfalls

Insufficient panel capacity for new loads

GFCI/AFCI requirements for wet locations

Coordination with plumbing and HVAC penetrations

Ventilation is critical for moisture control. Costs depend on fan quality, duct length, and exterior termination difficulty.

  • Install or replace exhaust fan with proper CFM rating
  • Run ductwork to exterior with backdraft damper
  • Seal all penetrations for air tightness
  • Test airflow and verify operation
Cost Breakdown
HVAC & Ventilation
Labor$200–400
1 each × $200–400/each
Materials$250–500
1 each × $250–500/each
Stage Total$450–900
Common Pitfalls

Duct routing constraints in joist bays

Make-up air requirements for exhaust fans

Noise transmission through ductwork

Framing repairs are often uncovered during demolition. Drywall costs include moisture-resistant panels and finish level appropriate for tile or paint.

  • Repair or replace damaged framing
  • Install moisture-resistant drywall on walls and ceiling
  • Tape, mud, and sand joints to smooth finish
  • Apply primer/sealer before tiling
Cost Breakdown
Framing & Drywall
Labor$1,500–3,000
250 sqft × $6–12/sqft
Materials$1,000–2,000
250 sqft × $4–8/sqft
Stage Total$2,500–5,000
Common Pitfalls

Uneven studs requiring shimming

Moisture-resistant drywall required in wet areas

Blocking for grab bars or heavy fixtures

Tile installation is labor-intensive and requires meticulous waterproofing. Material costs vary widely with tile selection; labor reflects pattern complexity and substrate prep.

  • Apply waterproofing membrane to shower walls and floor
  • Install shower pan or custom mortar bed with proper slope
  • Set wall and floor tile with appropriate mortar
  • Grout and seal all joints
Cost Breakdown
Waterproofing & Tiling
Labor$2,400–4,800
200 sqft × $12–24/sqft
Materials$2,600–5,200
200 sqft × $13–26/sqft
Stage Total$5,000–10,000
Common Pitfalls

Subfloor deflection causing cracked grout

Improper slope in shower pan

Tile layout adjustments for niche or bench

Fixture installation includes final connections and alignment. Costs depend on fixture weight, mounting complexity, and any custom fabrication.

  • Install vanity with countertop and sink
  • Mount toilet with new wax ring and supply line
  • Set shower/tub unit or install glass enclosure
  • Connect all supply and drain lines
  • Install faucets, showerheads, and accessories
Cost Breakdown
Fixture Installation
Labor$1,000–2,000
5 each × $200–400/each
Materials$500–1,000
5 each × $100–200/each
Stage Total$1,500–3,000
Common Pitfalls

Vanity not level or plumb

Toilet flange height mismatches

Shower door alignment issues

Painting in bathrooms requires mold-resistant products. Labor includes careful cutting around finished surfaces and multiple coats for durability.

  • Apply moisture-resistant primer to drywall
  • Caulk all joints and transitions
  • Paint walls and ceiling with two coats
  • Touch up after fixture installation
Cost Breakdown
Painting & Finishing
Labor$500–1,000
250 sqft × $2–4/sqft
Materials$250–500
250 sqft × $1–2/sqft
Stage Total$750–1,500
Common Pitfalls

Moisture-resistant paint required for high humidity

Cutting in around tile and fixtures

Ventilation during curing

Final cleanup ensures the space is move-in ready. A thorough punch list walk-through catches any remaining defects before project closeout.

  • Remove all construction debris
  • Clean all surfaces, fixtures, and glass
  • Complete punch list items
  • Provide maintenance instructions and warranties
Cost Breakdown
Final Cleanup & Punch List
Labor$300–600
1 job × $300–600/job
Materials$0–0
1 job × $0–0/job
Stage Total$300–600
Common Pitfalls

Missed caulk lines or grout haze

Scratches on fixtures from construction

Scheduling final inspections